← All insights
Supply chainOct 2026 · 6 min read

How to Send a Supplier Emissions Data Request

By Nishanth Kumar Sirivolu · Co-Founder, CarbonMeter

A request for a product carbon footprint often comes back with a company-wide estimate, a sustainability report or a number with no production site attached. None tells you what happened at the plant that made your goods.

A usable supplier emissions data request must identify the plant, product and production period, then connect the emissions figure to production records. This guide sets out the fields to request and a standard response format.

Start with the plant that made the goods

Send the request to your commercial contact, but ask for the response to be completed by someone with access to plant production and energy records. This may be the plant manager, environmental team, energy manager or production accountant.

Ask which physical plant made the goods on each shipment. Record its legal name, trading name, full address and country. If several plants can make the same product, require the supplier to identify the plant used rather than providing a group average.

The production route must also belong to that plant. Steel made from iron ore, coke and a blast furnace has different inputs from steel made by melting scrap or direct reduced iron in an electric arc furnace. A supplier name and product description alone cannot distinguish those routes.

HMRC and HM Treasury's CBAM policy summary on gov.uk says UK CBAM starts on 1 January 2027 and covers aluminium, cement, fertilisers, hydrogen, and iron and steel. Importers of goods in those sectors should build the plant link into purchasing and shipment records now.

Identify the product, plant and production period

Use identifiers that procurement, logistics and the plant can all recognise. Ask for your purchase order or contract reference, the supplier's product code, the product description and the relevant commodity code. Include grade, specification or composition where those details distinguish one production route from another.

Define the production period with start and end dates. Ask whether the figure covers the batch that supplied your order, a production campaign or all output from the plant during that period. The response should state which basis was used rather than leaving you to infer it.

Request the quantity made during the stated period and the quantity supplied to you. Record both in a named physical unit. This gives you a denominator for the emissions intensity and a separate quantity to connect with your imports.

Request the emissions figure in a consistent form

Ask for total embedded emissions and emissions per tonne of product. Require the supplier to state the emissions unit, product unit, calculation boundary and whether the result contains direct emissions, indirect electricity emissions or both.

Do not accept a bare number. Ask for the calculation method, the person or organisation that prepared it, the preparation date and any verification status. Verification status should be a factual response such as not verified, internally reviewed or externally verified, with the verifier named where applicable.

If a plant makes several products, ask how shared fuel, electricity and process emissions were allocated. Record the allocation basis in words, such as product mass, production time or direct measurement. This lets you see whether two supplier figures were prepared on comparable terms.

Ask for the production route, inputs, fuel and power data

For cement, ask whether the plant makes clinker or only grinds bought-in clinker. At a clinker plant, limestone releases process CO₂ when heated and the kiln burns fuel. Request clinker output, cement output, clinker consumed, raw-meal chemistry, fuel types and quantities, calorific values, carbon content and electricity per tonne.

Where a cement plant uses alternative fuels, request the quantity and biomass fraction, together with how that fraction was determined. Where it buys clinker, request the clinker supplier's embedded emissions per tonne. Also record slag or fly ash quantities because these materials can replace clinker in blended cement.

For steel, begin with the route. A blast furnace and basic oxygen furnace route needs hot-metal output, coal and coke use, reductant rates, limestone and dolomite quantities, and the shares of pig iron and scrap. An electric arc furnace response should give output, scrap, direct reduced iron and pig iron inputs, electricity use and the electricity source.

Ask for embedded emissions per tonne of bought-in precursors such as pellets, direct reduced iron, hot briquetted iron, pig iron and ferro-alloys. For electricity, record whether it came from the grid or a captive plant. For grid power, ask for the grid country. For a captive plant, request its fuel and efficiency data.

Use one response table for every supplier

Put the fields in a spreadsheet or portal rather than asking an open question by email. Keep one row structure across suppliers and allow supporting files to be attached against the relevant field.

FieldRequired responseEvidence to attach or reference
Plant identityLegal name, site name, full address and countryPlant document showing the name and address
Product identityBuyer reference, supplier code, description, commodity code, grade and specificationOrder, invoice or product specification
Production periodStart date, end date and whether data covers a batch, campaign or plant periodProduction record reference
Production quantityTotal product made and named physical unitProduction summary
Supplied quantityQuantity supplied to the buyer and named physical unitInvoice or shipment record
Production routeNamed route and principal production stagesProcess description or plant flow record
Embedded emissionsTotal emissions and emissions per tonne, split into direct and indirect electricity figures where availableCalculation file
Inputs and precursorsType, quantity, source plant and embedded emissions where suppliedSupplier declarations and specifications
Fuel and electricityFuel type, quantity and relevant properties, plus electricity quantity and sourceFuel records, electricity records and specification sheets
Method and reviewBoundary, allocation method, preparer, preparation date and verification statusMethod statement and verification document where one exists

Ask the supplier to mark unavailable fields explicitly. A blank cell is ambiguous. It might mean zero, not applicable, not measured or not disclosed.

What if the supplier cannot provide actual data?

HMRC and HM Treasury's CBAM policy summary says UK importers can report actual embedded emissions for CBAM goods or use government default values. Default values are set by government and are not specific to the supplier's plant. Lower real emissions can only be recognised when the supplier reports its own data.

If actual data is unavailable, record that answer rather than substituting an unsupported estimate. Ask which fields the plant can provide now, who owns the missing records and when the next complete production period will close. Start with plant identity, route, output, main inputs, fuel and electricity because these establish the structure for a later calculation.

Do not replace a plant response with a supplier's corporate footprint. Keep the default-value route separate from the actual-data route in your records, and retain the supplier correspondence that explains why actual data was unavailable.

CarbonMeter's CBAM readiness pilots map imports to the plants that made them and collect those suppliers' real embedded emissions.

What to do this quarter

  • List imported products and the suppliers that provide them.
  • Add a field for the plant that made each product.
  • Send the same response table to every relevant supplier.
  • Review answers for missing periods, units, routes and evidence.
  • Separate actual plant data from government default values in your records.

Map imports to supplier plants

CBAM readiness pilots map imports to the plants that made them and collect those suppliers' real embedded emissions. This is not a self-serve product.

Explore CBAM pilots

Sources

Frequently asked questions

What should a supplier emissions data request include?

Request the plant name and address, product identity, production period, output, production route, inputs, fuel, electricity, embedded emissions, calculation method and supporting evidence.

Can a supplier provide a company-wide carbon footprint?

Ask instead for data from the plant that made the goods and for the relevant production period. A company-wide figure does not identify the route, inputs or energy used for your product.

Can a UK importer use default emissions values?

HMRC and HM Treasury's CBAM policy summary says UK importers can report actual embedded emissions for CBAM goods or use government default values. The defaults are not specific to an individual supplier's plant.

When does UK CBAM start?

HMRC and HM Treasury's CBAM policy summary says UK CBAM starts on 1 January 2027. It covers aluminium, cement, fertilisers, hydrogen, and iron and steel.

Related articles